Licensed demolisher AD214737

Builders and Developers

One contractor from the first strip out to the level your slab needs

Demolition, asbestos management, excavation and cartage held on one contract, sequenced against your programme rather than against four other subcontractors' availability.

0456 220 552
Licence
Demolition licence AD214737, SafeWork NSW, current to March 2031
Scope
Four of our five service families on one contract and one point of contact
Coverage
Wollongong through Greater Sydney and the Central Coast to Newcastle

Where each stage sits

What actually moves the date

Site works rarely delay a project because the demolition took too long. They delay it because something was found late, or because three separate contractors each needed the site at a different time.

  1. 01

    Site acquired, approval in train

    Due diligence on what is actually on the block

    Asbestos, fill of unknown origin, a pool nobody mentioned, rock, or a neighbouring structure on the boundary. These are the things that move a programme after contracts are signed, and all of them are visible at a site visit.

  2. 02

    Approval granted, pre start

    Disconnections, notifications and protection

    Service disconnections are booked with the authority and are outside everyone's control, so they start the day approval lands rather than the week before demolition. Hoarding, dust and sediment control and adjoining property protection are scoped at the same time.

  3. 03

    Site works window

    Hazardous material out, then the structure down

    Asbestos removal by licensed removalists, air monitoring and independent clearance, then demolition in a controlled sequence with material sorted and carted as it comes down rather than stockpiled.

  4. 04

    Earthworks

    The dig, on the same mobilisation where it suits you

    Bulk excavation, site cut, basement or detailed excavation for footings and piers. Where demolition and excavation sit on one contract, there is one mobilisation and one programme instead of two.

  5. 05

    Handover to the build

    Cleared, graded and at the level your engineer specified

    Site left clean, swept and compacted where that is in scope, with disposal dockets handed over so the waste trail is documented rather than described.

Why it matters

What one contract actually changes

Splitting site works across a demolisher, an asbestos contractor, an excavator and a cartage company is normal, and it works. It also means four mobilisations, four scopes with gaps between them, and four diaries to line up.

  • One scope, no gaps. The questions that usually fall between contractors, who takes the slab, who takes the fill, who leaves the block at what level, are answered in one place.
  • Shared mobilisation. Where demolition and the dig run together, the plant comes once. On a tight block that is the single biggest saving available.
  • One sequence. Asbestos clearance before demolition, demolition before the dig, cartage alongside both rather than after.
  • One documentation trail. The licence, the notifications and the disposal dockets arrive together rather than from four sources.

What it does not change: the asbestos removal licence still sits with the licensed removalist and the clearance is still issued independently. That is how it has to work.

Levelled and cleared Sydney building block with the boundary fencing in place and no debris remaining

Scoping

What makes a site works quote accurate

The more of this you have, the less of the price is contingency.

What it isWhat it settlesIf we do not have it
Address and site accessMachine size, truck access and whether material can be carried outWe visit the site, which is the default survey
Approval or CDCWhat the consent actually permits, and the conditions attached to itThe scope of what you expect to be granted and the flag that goes with it
Hazardous materials reportWhether asbestos removal is a day or a week, and who holds the licenceWe arrange assessment before the quote is finalised
Geotechnical reportRock, fill and footing methodPrice an allowance with rates instead of a fixed figure
Civil or architectural setCut levels, tolerance and the extent of the slabWe quote to clear, graded and at the level nominated
Your programme datesWhether demolition and the dig go on one mobilisation or twoWe scope them separately, which costs more

What we will not do

We will not put a fixed price on rock, contaminated soil or asbestos quantity before anyone has looked at them. Those are priced on rates agreed before we start, so the exposure is visible rather than buried in a contingency you cannot see.

Working on more than one site at a time

Same contact, same scope language and the same documentation across the corridor, from Wollongong through Greater Sydney to Newcastle.

Builders and developers

Send the site, or send the drawings

Either works. If you have plans, a hazardous materials report or a geotechnical report, send them with a scope and we will come back with a number that has conditions attached to it rather than surprises.

  • Demolition, asbestos management, excavation and cartage on one contract
  • Licensed demolisher AD214737
  • A written scope that states the handover condition
Prefer to talk 0456 220 552

Special demolition offer

Get your free demolition quote

Demolition and removal services from $15,999*. Tell us about your project and we'll help you understand the costs.

*Starting price applies to eligible demolition and removal projects only. Final pricing depends on structure size, materials, site access, location, waste disposal requirements, hazardous materials and any necessary approvals. A final quote will be provided following project assessment.

Or call 0456 220 552 during business hours, or use the full quote request form.