Knockdown then a benched cut
The standard Charlestown sequence, because very few blocks here are flat.
- How it is handled
- Structure removed, then the cut taken in benches from the high side to the nominated platform level.
- What does it
- Midi to large excavator able to work on a grade, truck and dog for the volume.