Knockdown then a cut into the fall
The standard Corrimal sequence on the lower slopes.
- How it is handled
- Structure removed, then the cut taken to the nominated level with the spoil classified once and carted on the same contract.
- What does it
- Midi excavator, tippers or a truck and dog depending on the street.