Walk up block near the centre
Dee Why redevelopment often starts with a unit block rather than a house, on a site with footpaths in use and neighbours close.
- How it is handled
- Survey, disconnections in writing, soft strip, then the structure down in stages behind hoarding with traffic management in place.
- What does it
- Mid to large excavator where there is room, hoarding and dust control throughout.