Unit block and basement as one contract
The Epping redevelopment job, where the demolition and the dig are two halves of one programme.
- How it is handled
- Survey, disconnections, soft strip, the structure in stages, then the dig to the retention design with the spoil classified once.
- What does it
- Large excavator with a grapple, then a toothed bucket for the clay, truck and dog for volume.