Walk up block near the centre
Three or four storeys of brick and concrete rather than a house, on a site with footpaths in use.
- How it is handled
- Survey, disconnections confirmed in writing, soft strip, then the structure in planned stages behind hoarding.
- What does it
- Mid to large excavator with a grapple, hoarding, dust control and traffic management.