Site cut and levelling on a new estate block
Bringing a greenfield lot to the platform level the civil design calls for.
- How it is handled
- Topsoil stripped and stockpiled, the cut taken to design level, then fill placed and compacted in layers where the level has to be built up.
- What does it
- Large excavator, truck and dogs for volume, a roller for compaction.