Knockdown then a cut into the fall
Manly Vale blocks slope, so the demolition is usually the first half of a job that ends with a building platform.
- How it is handled
- Structure removed, then the cut taken in benches from the high side with each level stable before the next is opened.
- What does it
- Midi excavator able to work on a grade, tippers staged at the street.