Tight coastal block with no side access
The characteristic Merewether constraint, and the thing that sets the programme.
- How it is handled
- Smaller plant or hand demolition with material carried out and loaded at the kerb in sequenced loads.
- What does it
- Mini excavator, hand tools, tippers staged at the street.