Elevated block on sandstone
On the higher Narrabeen streets the rock is close enough to the surface that it decides the dig rather than the structure.
- How it is handled
- Rock hammered for the face and ripped where the bedding helps, priced by the cubic metre at a rate agreed before work starts.
- What does it
- Mid to large excavator with a hydraulic hammer, zero tail swing against boundaries.