Building platform to the civil design
Cut, fill and benching to bring a lot to the level and tolerance the engineer nominated.
- How it is handled
- Topsoil stripped first, the cut taken to design level, fill placed and compacted in layers, then the platform finished and left ready for set out.
- What does it
- Large excavator, roller, truck and dogs for both directions.