Dig on low lying lakeside ground
Where the water table is close enough that the face will not stand on its own.
- How it is handled
- Battered back or supported rather than left vertical, with dewatering planned and pumps on site from the start.
- What does it
- Excavator with pumps, a batter or shoring designed for the condition.