Wrapped, labelled and tracked to a facility licensed to take it

Safe wrapping, transport and disposal of asbestos material at licensed facilities, with the dockets handed back to you. Asbestos does not go to a general waste facility, it is not recycled, and the paperwork that proves where it went is part of the job rather than an afterthought.

0456 220 552

Removal by licensed asbestos removalists. Max holds demolition licence AD214737

Truck and dog being loaded with spoil beside an excavator on a Sydney demolition site

Before anything starts

Six things have to be settled first, and not all of them are ours

Most jobs that run late run late on this list rather than on the work itself. Each line says who owns it.

  1. 01

    Material identified

    Who Max, through an accredited laboratory

    Bonded and friable material are wrapped, transported and received differently.

  2. 02

    Quantity estimated

    Who Max, from the survey

    Disposal is priced by weight or volume at the facility, so the quantity drives the cost.

  3. 03

    Facility booked

    Who Max

    A facility licensed to receive that material, confirmed before the first load leaves.

  4. 04

    Wrapping and labelling

    Who The licensed removalist

    Double wrapped in heavy duty plastic and labelled to the requirement.

  5. 05

    Covered transport arranged

    Who Max

    Loads are covered and the vehicle is suited to the material.

  6. 06

    Dockets collected

    Who Max

    From the facility, and handed to you. They do not exist anywhere else.

Scope

What the quote does and does not cover

Stated side by side so there is nothing to discover later. Anything in the right hand column can be added, it is simply priced separately.

Included as standard

ItemWhat that means
Wrapping and labellingDouble wrapped and labelled by the licensed removalist
LoadingWithout breaking the material up further
Covered transportTo the licensed facility
Disposal feesAt the facility, as a stated line
DocketsCollected and handed to you
CoordinationSequenced against the removal so material does not sit on site

Quoted separately

ItemWhy it is separate
RemovalA separate scope, carried out by licensed asbestos removalists
Disposal of material we did not removeUnless it has been wrapped and labelled to the requirement
General demolition wasteA different stream with a different destination
Contaminated soilPriced on its classification and tonnage
Storage on siteMaterial leaves rather than accumulating
Disposal at a facility that will not accept the classificationThe facility is chosen by what the material is

The detail

Why disposal is a bigger line than people expect

  • It is priced at the gate. Licensed facilities charge by weight or volume for asbestos, at rates well above general waste.
  • There are fewer facilities. Which means the cartage distance is often longer, and the distance is part of the price.
  • It cannot be mixed. Asbestos material travels on its own. Putting it in with general waste contaminates the whole load and the whole load is then charged as asbestos.
  • It cannot be compacted. Breaking it down to fit more in is exactly the thing the wrapping exists to prevent.
  • Soil is heavy. Asbestos contaminated soil generates tonnage quickly, which is why it is priced separately from sheeting.
  • The dockets are part of the deliverable. They are what proves the material went where it was supposed to, and they cannot be reconstructed later.

What we need to quote it

The address
So we can look at access and what is around it
Photographs
One from the street and one of the work itself
Any reports you hold
Hazardous materials, structural, survey or levels
Your dates
What has to be finished by when, and what is waiting on it

We attend the site before quoting anything substantial.

Keep the dockets with the clearance certificate

Together they are the record that the property was handled properly. A future purchaser, certifier or lender may ask for both.

Air Monitoring and Clearance Certificates

Before you book

What people ask about this one

Can I put asbestos in a skip?
Not in a general waste skip. It has to be wrapped, labelled, transported and received by a facility licensed for it. Putting it in a mixed skip contaminates the entire load.
Is asbestos recycled?
No. It is buried at a facility licensed to receive it. There is no recovery pathway for it in the way there is for concrete, steel or timber.
How is it priced?
By weight or volume at the facility, plus the cartage. The survey quantity is what makes that estimable before the job rather than after it.
Can you dispose of material somebody else removed?
Only if it has been wrapped and labelled to the requirement by a licensed removalist. We are not able to take unwrapped material off a site.
What do I get at the end?
The disposal dockets from the licensed facility. Keep them with the clearance certificate.

Get a quote

Tell us what has been removed and wrapped

Material type and approximate quantity is enough to price disposal. If it has not been removed yet, the survey is the step before this one.

  • Licensed facilities only, chosen by what the material is
  • Covered transport, sequenced so material does not sit on site
  • Dockets collected and handed to you
Prefer to talk 0456 220 552

Special demolition offer

Get your free demolition quote

Demolition and removal services from $15,999*. Tell us about your project and we'll help you understand the costs.

*Starting price applies to eligible demolition and removal projects only. Final pricing depends on structure size, materials, site access, location, waste disposal requirements, hazardous materials and any necessary approvals. A final quote will be provided following project assessment.

Or call 0456 220 552 during business hours, or use the full quote request form.

Call Now