Site Rehabilitation

The last pass, leaving a site something can sit on

Reshaping, compacting and preparing a site for building or reuse. The finishing work that turns a cleared or remediated block into a surface with a known level and a known density, with the drainage falling where it should rather than where it ended up.

0456 220 552

Carried out under demolition licence AD214737

Levelled and cleared Sydney building block with the boundary fencing in place and no debris remaining

Before anything starts

Six things have to be settled first, and not all of them are ours

Most jobs that run late run late on this list rather than on the work itself. Each line says who owns it.

  1. 01

    Final levels

    Who You, through your surveyor or engineer

    What the finished surface has to be, and where it falls to.

  2. 02

    Compaction requirement

    Who You, through your engineer

    What density, in what layers, and who tests it.

  3. 03

    Drainage intent

    Who You, with your engineer

    Where water is meant to go. A site shaped without this collects it somewhere nobody wanted.

  4. 04

    Material available on site

    Who Both of us

    What can be reused for shaping, and what has to be imported.

  5. 05

    Access for the finishing plant

    Who Both of us

    Rollers and graders need room, and on a tight block that is not always available.

  6. 06

    Handover condition agreed

    Who Both of us

    Trimmed, compacted, swept, fenced. Agreed before rather than discussed after.

Scope

What the quote does and does not cover

Stated side by side so there is nothing to discover later. Anything in the right hand column can be added, it is simply priced separately.

Included as standard

ItemWhat that means
ReshapingTo the final levels and falls
PlacementOf suitable material available on site
CompactionIn layers to the specified standard
TrimFinished surface trimmed to level
Drainage fallsShaped so water goes where the design intends
Site tidySwept and left in the agreed condition

Quoted separately

ItemWhy it is separate
Compaction testingGeotechnical work, by your consultant
Imported fillSupplied and placed as a separate line
Drainage structuresPits, pipes and trade work by others
Topsoil and turfLandscaping work
Retaining structuresEngineered and built by others
Permanent fencingA separate trade

The detail

What rehabilitation actually leaves behind

  • A known level. Not an approximate one. The surface is trimmed to what the drawings say, because what goes on top of it is built to a dimension.
  • A known density. Compacted in layers to the specified standard, so that what is built on it does not settle.
  • Falls that work. Water going where the design wants it rather than pooling against a structure or running onto a neighbour.
  • No surprises underneath. Material that was placed and compacted rather than pushed into a low spot and covered over.
  • A site somebody can start on. Swept, clear and fenced where that is in scope.
  • A record. What was placed, from where, and to what standard.

What we need to quote it

The address
So we can look at access and what is around it
Photographs
One from the street and one of the work itself
Any reports you hold
Hazardous materials, structural, survey or levels
Your dates
What has to be finished by when, and what is waiting on it

We attend the site before quoting anything substantial.

If material has to come in to finish the shaping

Clean fill, VENM and road base supplied and placed in layers, which is a separate line from reshaping what is already there.

Fill Supply and Land Repair

Before you book

What people ask about this one

Is this the same as levelling?
It overlaps. Levelling is cutting and filling to a platform. Rehabilitation is the finishing pass: shaping, compacting and leaving falls that work, so the site is ready rather than merely flat.
Do I need it if the site is already cleared?
If something is going to be built on it, yes. A cleared block is not a prepared one, and a surface nobody compacted is a surface that settles.
Who tests the compaction?
A geotechnical consultant, engaged by you, independently of us. That separation is the point.
Can you shape it for drainage?
To the falls on the design, yes. We will not invent the drainage intent: where water is supposed to go is an engineering decision with consequences for the neighbours.
What condition is it left in?
Whatever is agreed before we start. Trimmed to level, compacted where that is in scope, swept and left clear. Putting that in writing beforehand avoids the only argument this scope produces.

Get a quote

Tell us the finished level and the falls

Final levels, the compaction standard and where the water is meant to go. That is a rehabilitation scope in three lines.

  • Trimmed to the level your engineer specified
  • Compacted in layers, tested independently
  • Handover condition agreed in writing before we start
Prefer to talk 0456 220 552

Special demolition offer

Get your free demolition quote

Demolition and removal services from $15,999*. Tell us about your project and we'll help you understand the costs.

*Starting price applies to eligible demolition and removal projects only. Final pricing depends on structure size, materials, site access, location, waste disposal requirements, hazardous materials and any necessary approvals. A final quote will be provided following project assessment.

Or call 0456 220 552 during business hours, or use the full quote request form.

Call Now